Under section 42(5) of the Buildings Ordinance, the Building Authority is not empowered to approve building works which is already completed. Therefore, property owner cannot apply for approval from the Buildings Department (BD) to carry out building alteration works after the works is completed to make the unauthorized building works (UBW) become legal. Property owner must remove UBW first and then appoint an Authorized Person to prepare and submit plans for the approval of BD. Property owner can commence the concerned works after the plan is approved by BD.
If the unauthorized building works have been completed, can I seek approval from the Buildings Department so that the UBW can become legal?
Source:1823 / Buildings Department
Related
- What are the consequences of failing to comply with statutory notices for Mandatory Building Inspection?
- Why do I receive the statutory notice for Mandatory Building Inspection? What should I do and when do I need to complete the requirements?
- What are the consequences of failing to comply with statutory notices for Mandatory Window Inspection?
- Can I apply for an exemption from Mandatory Window Inspection? My windows were repaired not long ago.
- Why do I receive the statutory notice for Mandatory Window Inspection from the Buildings Department? What should I do and when do I need to complete the requirements?
- How to apply for alteration or addition work in existing buildings (including installation of glass panels, advertisement signboards and TV display on external walls)?
- What kinds of building works are subject to the control under the Minor Works Control System?
- Is it necessary for an architectural and associated consultant to register, before the consultant can undertake consultancies for building projects of the Government?